Bridge Inspection Update - November 20

The annual inspection was conducted on the Glen Road Bridge on November 20, 2021. The consultants that performed the inspection informed City staff that the bridge condition is much the same as it was in 2020 and that they did not find any new significant deterioration that was not already noted during the previous inspection.

The bridge will remain open at this time and will wait until construction starts next year. Staff anticipate receiving the final bridge inspection report before the end of 2021.